Pistol Ridge Land Services logoPistol RidgeLand Services
Finished gravel pad ready for a new house
LaRue County, Kentucky

Building Pads in Hodgenville, KY

New homes on acreage, metal shops and pole barns around Hodgenville start with a pad that sits up out of the wet, packed in lifts and capped with stone, with a way in for the trucks. Pistol Ridge Land Services works here from its base in Finley, KY. For a quote, call Trey at (270) 272-8739.

  • 30 Years Experience
  • Full-Size & Compact Machines
  • Straight Quotes

Tell us about the job

Only your name and phone are required.

Building Pads in Hodgenville, KY

The Pad Is the Part You Never See Again

Once the slab is poured, nobody looks at the pad again until something goes wrong. A pad of loose fill settles and the floor cracks. A pad set in a low spot holds water against the foundation. In LaRue County, with clay soil and sinkhole ground, where the water goes is the first question on any building site.

Pistol Ridge Land Services builds house pads and building pads in Hodgenville and across LaRue County. We come up from Finley, in Taylor County, and Trey runs every job with 30 years of experience. He looks at where water runs on your lot, strips the topsoil, cuts and fills to level, packs the fill in lifts and spreads a stone cap. If the pad is for a home, our house pads page explains what your builder will want.

When he is done, the pad sits up out of the wet, level and wider than the building, with the ground falling away so rain leaves. A gravel driveway in Hodgenville can tie it to the road, and a grown-up site can be opened first with land clearing.

Gravel pad in front of an open garage on a new build
What it includes

How we build a pad on LaRue County ground

  • Lot walked for water, rock and sinkholes
  • Topsoil stripped and saved
  • Fill packed in lifts, never dumped
  • Stone cap spread and leveled
  • Grade shaped to shed water
  • Approach built off the road or drive
Local know-how

Pad Work Around Hodgenville

Sinkhole ground

Much of LaRue County is karst. The Sinking Spring at the Abraham Lincoln Birthplace park, just south of town, is named for water that drops into the rock and disappears. A pad should never sit over a sinkhole or send its runoff into one, and soft spots get dug out and packed back in layers. Trey walks the lot and points out anything that makes a spot a poor bet.

New homes as Elizabethtown grows south

LaRue County sits between Elizabethtown and Campbellsville, and KY 61 runs northwest about 12 miles from Hodgenville to E-town. As that growth pushes south, new houses go up on acreage around Hodgenville, Buffalo, Magnolia and Upton, along with shops and pole barns on the farms. We handle the pad, the drive and the grade around the building.

Before anyone digs

Have the building size and the floor height your builder wants, or the site sheet from your pole barn supplier. Ask the city about a building in town, or the county offices for one outside it, before work starts. Kentucky 811 must be notified at least two full working days before machine digging, and private lines are yours to point out.

On the job

Pads Jobs We've Done

Real photos from Pistol Ridge job sites. See more work or read about our full building pads service.

Finished gravel pad ready for a new house
House Pad
Gravel pad in front of an open garage on a new build
Garage Pad
Gravel approach built up to a new garage
Truck Approach
Wide cut of bare dirt on a building site
Site Cut
Who builds house pads in Hodgenville, KY?

Pistol Ridge Land Services does. Trey builds house pads, shop pads and pole barn pads around Hodgenville and across LaRue County. Call (270) 272-8739 and he will come look at the lot and talk through where the building should sit.

Can you build a pad on a lot with sinkholes in LaRue County?

Often, yes, as long as the pad stays off the sinkhole and its runoff goes elsewhere. Trey finds them when he walks the lot and lays the pad out around them. If a spot is a poor bet, he will tell you before any work starts.

Do you build pole barn pads on farms around Hodgenville?

Yes. Pole barns, hay sheds and shops are a big part of our pad work. The pad is built bigger than the barn, packed, capped with stone and given an approach a truck and trailer can use.

What do I need ready before a pad is built?

The building size, the floor height your builder wants and a rough idea of where it goes. Know where your well, septic tank and buried lines are, and ask the city or county what the building needs. Then Trey can walk the lot and give you a straight quote.

How It Works

From First Call to Final Pass

Reach Out

Call or send the form and tell us where the job is and what needs doing.

Walk the Site

We look at the ground, the access and the scope so there are no surprises.

Get a Quote

You get a straight quote and a plan for the work.

We Dig In

The machines roll in and the job gets done right.

Need Pads in Hodgenville?

Call Trey or send the details. You'll get a straight answer on what the job takes.

Call NowGet a Quote