
House Pad Contractor for New Homes in Central KY
Pistol Ridge Land Services builds house pads for new homes in central Kentucky: level, packed and stone-topped for a stick-built or modular home, set at the height your builder wants and shaped so water leaves the house. For a quote, call Trey at (270) 272-8739.
- 30 Years Experience
- Full-Size & Compact Machines
- Straight Quotes
House Pads: What the Job Involves
A new house is the biggest thing most families ever build, and every part of it rests on dirt somebody else got ready. If that dirt was dumped and smoothed instead of packed, the house tells you within a few years. A crack runs across the garage floor. A door that closed fine now drags. Water sits against the foundation on the low side every time it rains.
Pistol Ridge Land Services builds house pads for new homes across central Kentucky, for stick-built houses and for modular and manufactured home sites. Trey works from your builder's plans or your setter's site sheet. He strips the sod and topsoil, cuts the high side, fills the low side with good clay and packs the fill in thin lifts. Then he spreads a stone cap and sets the finished height. He has 30 years of experience and runs the machines himself.
When he leaves, the home site is level where it needs to be, firm, a few feet wider than the house and a little higher than the yard around it. The ground falls away on every side. A gravel approach is in, so the concrete truck, the lumber truck or the set crew can get there without cutting ruts in your lot.

What a house pad job covers
- Sod, roots and topsoil stripped off
- High side cut, low side filled
- Clay fill packed in thin lifts
- Stone cap spread and leveled
- Pad set to the plan's floor height
- Yard shaped to fall away from the house
- Gravel approach for trucks and set crews
Stick-built and modular home sites
A house built on site and a home that arrives in sections both need the same thing first: firm, level ground at the right height. The difference is in what goes on top. A stick-built house may go on a slab, a crawl space or a basement, and the footers are dug into the pad. A modular or manufactured home site has its own setup, and the company setting it will have a site sheet. Ask your builder or setter for their requirements before any dirt moves, and give them to Trey. We build the ground to match.
Why compaction matters most
Fill dirt is fluffy when it comes out of the bucket. Left alone, it settles for years, and a house on top settles with it. The fix is to spread fill in thin layers and pack each one at the right moisture before the next goes on. That takes more passes and more time than pushing a pile flat. It is also the part nobody sees once the slab is poured, which is why it gets skipped. Our guide to building pads explains it in more detail.
Height, water and the yard around it
A house pad should sit a little above the ground around it, so rain runs off and away instead of toward the foundation. On flat ground that means building up. On a slope it means benching into the hill and shaping a swale above the house to turn water around it. Trey sets the height from the plans and from how your lot drains. When the pad is done, the same crew can open the trench for water and electric and finish the drive. The building pad cost guide covers what moves the price.





House Pads Across Central Kentucky
Based in Finley, between Campbellsville and Lebanon. Pick your town, or call and ask if we cover it.
Building Pads pages for your town
Close to home
Regular area
For the right job
House Pads Questions
Not seeing yours? Call (270) 272-8739 and ask Trey, or read the common questions.
- Cost GuideWhat Does a Building Pad Cost in Kentucky?
- GuideWhat Is a Building Pad and Why Do You Need One?
- Cost GuideWhat Does a Gravel Driveway Cost in Kentucky?
- GuideHow Long Does a Gravel Driveway Last?
- Cost GuideWhat Does a Pole Barn Pad Cost in Kentucky?
- GuideDo I Need a Permit for a Pole Barn on a Farm in Kentucky?
How much bigger than the house should the pad be?
Bigger on every side, so the crew has room to work and the footers and slab edge sit on firm ground, not on the soft shoulder of the fill. Your builder or home setter may give an exact figure. If they do, we build to it.
Can you build a pad for a modular home?
Yes. Modular and manufactured home sites need level, packed ground at the right height with room for the delivery and the set crew. Get the site sheet from the company setting the home, and Trey builds the pad to it.
Who digs the footers for a new house?
Ask your builder how they want it handled. We dig footers and basements as part of our excavation work, and we can build the pad and dig the footers on the same trip when the builder wants that.
How high should a house pad sit above the yard?
Just high enough that rain heads away from the house all the way around. Your builder's plans usually set a floor height. Trey checks how the lot drains and builds to that.
Can a house pad be built on a sloped lot?
Usually. The uphill side is cut, the downhill side is filled and packed in lifts, and a swale above the house turns water around it. A few slopes are just too steep for a house pad, and you will hear that straight from Trey on the first visit.
From First Call to Final Pass
Reach Out
Call or send the form and tell us where the job is and what needs doing.
Walk the Site
We look at the ground, the access and the scope so there are no surprises.
Get a Quote
You get a straight quote and a plan for the work.
We Dig In
The machines roll in and the job gets done right.
Building Pads
Building, shop and home pads built level and solid.
Learn moreSpecialty jobGravel Driveways
New gravel drives, approaches and farm lanes built, and washed-out drives reshaped.
Learn moreSpecialty jobShop & Pole Barn Pads
Level, compacted pads for pole barns, metal shops, garages and farm buildings.
Learn moreServiceLand Clearing
Brush, trees and overgrowth cleared to open up usable land.
Learn moreServiceFence Row Clearing
Overgrown fence rows cleared out so you can see, fix or replace your fence.
Learn moreExcavation and pond work near you
Pages for the towns Trey works most, from Campbellsville and Lebanon out to Elizabethtown, Danville, Glasgow and Somerset.
Ready to Get Dirt Moving?
Call Trey or send the details. You'll get a straight answer on what the job takes.
